Valdosta Daily Times

April 4, 2013

Lane closure on Eager Road for water and sewer main installation


City of Valdosta

VALDOSTA — On Monday, April 15, the City of Valdosta will begin the installation of water and sewer mains along Eager Road as part of the Island 35C Water and Sewer Extension project. The westbound lane will be closed daily between the hours of 9 a.m. and 3 p.m., with normal traffic resuming at the end of each work day. This portion of the project is scheduled to be completed by May 17, weather permitting.

 

During the construction, the westbound traffic on Eager Road will be detoured along Northfield Road to Wendover Road, then back onto Eager. Motorists seeking access to Country Club Drive may take Northfield Road through to Green Meadow Drive. Traffic in the eastbound lane of Eager will not be affected and will remain opened during construction.

 

Motorists are urged to use caution when driving through or around the construction area for their safety and the safety of workers.  Citizens may view the detour map at www.valdostacity.com.  For additional information, contact the Engineering Department at (229) 259-3530.